CHRISTO INDUSTRIES PTY LTD
Level 5 Plaster Finish Melbourne
Christo Industries provides Level 5 plaster finishing for selected residential, architectural, multi-residential and commercial projects throughout Melbourne and Victoria.
What is a Level 5 Finish?
A Level 5 finish is a higher-level plasterboard finishing system intended to improve surface uniformity across the plasterboard face and jointed areas before painting. It is typically specified where lighting conditions or premium finishes are more likely to reveal surface variations.
Level 5 vs Level 4
Level 4 is the standard finish for many plasterboard applications. Level 5 adds an additional finishing treatment across the broader plasterboard surface, helping reduce visual differences between board faces and stopped joints under demanding lighting conditions.
Where Level 5 May Be Specified
- Luxury and architectural homes
- Large areas of glazing
- Glancing or critical light conditions
- Long uninterrupted walls
- Large ceilings
- Feature lighting
- Dark or deep paint colours
- Higher-sheen finishes
- Premium commercial interiors
Level 5 Ceilings
Ceilings are particularly sensitive to glancing light from windows, skylights and artificial lighting. Where Level 5 is nominated, the plastering and painting systems should be coordinated to achieve the intended finish.
Plastering & Painting Under One Contractor
Because Christo Industries provides both plastering and painting, we can coordinate the substrate finish and paint system under one contractor, helping maintain continuity from plaster finishing through to final painting.
Request a Level 5 Quote
Send us the drawings, finish schedule and lighting information where available.
Need a Painting or Plastering Quote?
Send Christo Industries your drawings, specifications or project details and our estimating team can review the project and provide a quotation.
Send plans for a quote Call (03) 9923 7457